cushtie.com

Some progress

We went to bed late last night, and got up early this morning, so life was a bit hard today. Still, the contractors are working, both on rebuilding our front porch and on getting ready to tile the ground floor bathroom, so it felt like progress was being made. There’s likely to be very loud banging tomorrow, which means I should probably ride my bike to work and be able to concentrate, rather than listen to WWII re-enacted with hammers.
I took the car back to Enterprise today as we don’t need it for most of the week. Filling it up with petrol was a shock, with a gallon at almost six dollars. I got a call from the repair shop to say there’s been a delay due to covid, so even the repair estimate is backed up. Ah well. I guess this gives me more empathy for the non-electric driver.

Exit mobile version